Electrical and Instrumentation Installation for Power Plants · Electrical work supporting operations, including cable, panel, and lighting work for power and industrial facilities.
2026 entries use completion values; earlier entries use annual reported values.
Amounts: KRW million
Scroll the table horizontally to see periods and amounts. →
| Year | Scope of work | Client / counterparty | Reported work period | Value |
|---|---|---|---|---|
| 2026 | Leak-detection system installation | Woojin NTEC | 2026.08 | 6 |
| 2026 | Motor inspection and cleaning support | Geumhwa PSC | 2026.05 – 2026.06 | 126 |
| 2026 | Monitoring-system cable installation | KHNP | 2026.04 – 2026.06 | 21 |
| 2026 | Boiler thermocouple improvements | Korea Southern Power | 2026.04 – 2026.06 | 64 |
| 2026 | UPS removal and installation | International Electric | 2026.06 | 6 |
| 2026 | Computer and server replacement | BK Vision | 2026.05 | 10 |
| 2026 | Outdoor electrical equipment inspection | KHNP | 2026.04 – 2026.05 | 17 |
| 2026 | Equipment cable installation | Soosan Industries | 2026.01 – 2026.02 | 22 |
| 2026 | Additional emergency lighting installation | KHNP | 2026.07 | 19 |
| 2025 | Electrical upgrades to plant support facilities | Yurim Technology | 2024.11 – 2025.06 | 15 |
| 2025 | Street-light cable restoration | KHNP | 2025.01 | 21 |
| 2025 | Meter installation for heated bus-stop seats | Uljin County | 2024.12 – 2025.01 | 33 |
| 2025 | Power-supply work for fire-water pumps | KHNP | 2024.08 – 2025.02 | 351 |
| 2025 | Plant power-cable installation | KHNP | 2025.03 – 2025.04 | 13 |
| 2025 | Outdoor electrical equipment inspection | KHNP | 2025.04 – 2025.06 | 19 |
| 2025 | Power installation for relocated test equipment | KHNP | 2025.04 – 2025.06 | 123 |
| 2025 | Conduit installation for access equipment | KHNP | 2025.03 – 2025.04 | 19 |
| 2025 | Routine electrical maintenance support | KEPCO KPS | 2025.07 – 2026.06 | 260 |
| 2025 | Electrical power-supply installation | KHNP | 2025.11 – 2025.12 | 22 |
| 2025 | Temporary power-cable finishing | KHNP | 2025.11 – 2025.12 | 16 |
| 2025 | Equipment upgrades during planned maintenance | Soosan ENS | 2025.05 – 2025.06 | 61 |
| 2025 | Pump motor inspection support | Geumhwa PSC | 2025.05 – 2025.07 | 36 |
| 2025 | Plant equipment improvements · 7 work items | Soosan ENS | 2025.09 – 2025.11 | 75 |
| 2025 | Plant equipment improvements · 2 work items | Soosan ENS | 2025.08 – 2025.11 | 43 |
| 2025 | Charger replacement | International Electric | 2025.08 – 2025.10 | 40 |
| 2025 | Server rack and network-cable installation | BK Vision | 2025.09 – 2025.10 | 15 |
| 2025 | Fire-protection material restoration · 4 work items | Soosan ENS | 2025.07 – 2025.08 | 76 |
| 2024 | Electrical work for a distribution facility extension | Usam Distribution | 2023.10 – 2024.01 | 7 |
| 2024 | Electrical and communication work for welfare facilities | Wondae Construction | 2023.02 – 2024.02 | 11 |
| 2024 | Outdoor security-light replacement | KHNP | 2024.01 | 15 |
| 2024 | Inverter removal and installation | International Electric | 2023.12 – 2024.01 | 46 |
| 2024 | Research equipment removal and installation | International Electric | 2024.04 | 13 |
| 2024 | General electrical work · 5 work items | Multiple clients | 2024.01 – 2024.09 | 14 |
| 2024 | Electrical work for video-conferencing systems | KHNP | 2024.06 – 2024.07 | 16 |
| 2024 | Charger replacement | International Electric | 2024.06 – 2024.07 | 31 |
| 2024 | Residential electrical-cable removal | KHNP | 2024.07 | 20 |
| 2024 | Walkway lighting upgrades | Firstkeepers | 2024.07 – 2024.08 | 10 |
| 2024 | Outdoor security-light replacement | KHNP | 2024.08 – 2024.09 | 6 |
| 2024 | Plant power-cable installation | KHNP | 2024.08 | 13 |
| 2024 | Electrical heat-tracing cable installation | KHNP | 2024.09 | 11 |
| 2024 | Outdoor electrical equipment inspection | KHNP | 2024.08 – 2024.09 | 17 |
| 2024 | Electrical termination work for maintenance facilities | Samjin Engineering | 2024.06 – 2024.07 | 35 |
| 2024 | Charger and inverter replacement | International Electric | 2024.11 | 77 |
| 2024 | Crane power-supply modification | KHNP | 2024.11 – 2024.12 | 15 |
| 2024 | Electrical work for a landing pier | Uljin County | 2024.11 – 2024.12 | 10 |
| 2024 | UPS and panel removal and installation | International Electric | 2024.12 | 108 |
| 2024 | Electrical work for research facilities | KEC System | 2024.02 – 2024.03 | 22 |
| 2024 | Electrical installation for new commercial premises | Wondae Construction | 2023.12 – 2024.04 | 28 |
| 2024 | Wastewater facility alarm integration and flowmeter installation | KHNP | 2024.12 | 21 |
| 2023 | General electrical work | Private-sector client | 2023.01 | 5 |
| 2023 | Laboratory outlet and lighting distribution-board upgrades | KHNP | 2023.04 – 2023.05 | 18 |
| 2023 | Water-treatment equipment power-supply upgrades | KHNP | 2022.12 – 2023.04 | 19 |
| 2023 | Conduit and cable removal and installation | KHNP | 2023.04 – 2023.05 | 22 |
| 2023 | Office lighting and power-outlet replacement | KHNP | 2023.07 – 2023.08 | 18 |
| 2023 | Canopy lighting installation | KHNP | 2023.08 – 2023.09 | 13 |
| 2023 | Outdoor electrical equipment inspection | KHNP | 2023.09 – 2023.10 | 15 |
| 2023 | Conduit and cable removal and installation | KHNP | 2023.11 – 2023.12 | 22 |
| 2023 | Visitor-center walkway electrical work | KHNP | 2023.12 | 20 |
| 2023 | Electrical installation for a factory extension | Daewon Enterprise | 2022.10 – 2023.01 | 28 |
| 2023 | Inverter replacement and installation | International Electric | 2023.04 | 34 |
| 2023 | Electrical installation for a new care hospital | Seodong Construction | 2022.11 – 2023.06 | 402 |
| 2023 | Electrical work for mixed-use residential premises | Oju Construction | 2022.08 – 2023.06 | 37 |
| 2023 | Additional electrical work for cold storage | Oju Construction | 2023.02 | 22 |
| 2023 | Electrical work for IoT equipment | Yejang | 2023.06 – 2023.10 | 69 |
| 2023 | Electrical installation for a new manufacturing plant | Cheongna Construction | 2023.10 – 2023.12 | 53 |
| 2023 | Outdoor wiring replacement for residential facilities | Caritas Nam-gu Home | 2023.11 | 6 |
| 2023 | Office electrical repairs | Donga Design | 2023.12 | 16 |
| 2023 | Electrical work for a distribution facility extension | Usam Distribution | 2023.10 – 2024.01 | 7 |
| 2023 | Electrical installation for new manufacturing premises | Oju Construction | 2023.05 – 2023.07 | 39 |
| 2023 | Electrical and communication work for welfare facilities | Wondae Construction | 2023.02 – 2024.02 | 22 |
| 2023 | Electrical work for commercial premises | Hannam Construction | 2023.05 – 2023.11 | 17 |
| 2023 | Factory power installation | Arim Tech | 2023.01 – 2023.02 | 50 |
| 2023 | Power-service connection for a training center | Hyunchang Construction | 2023.01 – 2023.02 | 22 |
| 2023 | Power installation for research facilities | G3 | 2023.09 | 6 |
| 2023 | Office lighting improvements and electrical refurbishment | Wooin E&C Architects | 2023.12 | 6 |
| 2023 | Educational facility electrical refurbishment | Samhwa Construction | 2023.09 – 2023.11 | 37 |
| 2023 | Educational facility electrical refurbishment | Samhwa Construction | 2023.11 – 2023.12 | 75 |
| 2023 | General electrical work · 17 work items | Multiple clients | 2023.04 – 2023.11 | 26 |
| 2023 | Electrical work for school HVAC replacement | Daegu Dongbu High School | 2023.01 – 2023.02 | 50 |
| 2023 | Electrical work for public amenities | Daegu Nam-gu Office | 2023.08 – 2023.10 | 6 |
| 2023 | Railway facility electrical upgrades | KORAIL | 2023.10 – 2023.12 | 73 |
| 2023 | Electrical work for IoT equipment | Yejang | 2023.11 – 2023.12 | 41 |
| 2022 | Electrical installation for a new educational facility | Wondae Construction | 2022.08 – 2022.11 | 30 |
| 2022 | Electrical installation for a new factory | Oju Construction | 2022.10 – 2022.12 | 105 |
| 2022 | Cold-storage electrical work | Oju Construction | 2022.08 – 2023.01 | 69 |
| 2022 | Electrical installation for a new care hospital | Seodong Construction | 2022.11 – 2023.05 | 105 |
| 2022 | Electrical work for mixed-use residential premises | Oju Construction | 2022.08 – 2023.02 | 11 |
| 2022 | General electrical work · 14 work items | Multiple clients | 2022.07 – 2022.12 | 26 |
MECHANICAL
Mechanical
22entries
Mechanical Systems and Piping Support · Field-adapted installation support for mechanical systems, piping, temporary structures, and refurbishment works.
2026 entries use completion values; earlier entries use annual reported values.
Amounts: KRW million
Scroll the table horizontally to see periods and amounts. →
| Year | Scope of work | Client / counterparty | Reported work period | Value |
|---|---|---|---|---|
| 2026 | Mechanical equipment servicing during planned maintenance | KEPCO KPS | 2026.05 – 2026.07 | 132 |
| 2025 | Storage-rack replacement and installation | KHNP | 2025.01 | 20 |
| 2025 | Sanitary facility upgrades | KHNP | 2025.03 | 12 |
| 2025 | Mechanical work for training facilities | Public-sector client | 2025.06 – 2026.03 | 1 |
| 2025 | Temporary storage and fabrication shop installation | Hyundai E&C | 2025.06 – 2025.08 | 181 |
| 2025 | School sanitary mechanical-system upgrades | Yeongju Office of Education | 2025.07 – 2025.09 | 194 |
| 2025 | Mechanical work for facility refurbishment | Hyundai E&C | 2025.07 – 2025.11 | 44 |
| 2025 | Hot-water tank piping for welfare facilities | Firstkeepers | 2025.11 | 4 |
| 2024 | Instrument support-anchor repairs | KHNP | 2024.06 | 6 |
| 2024 | Panel-cover machining | KHNP | 2024.08 – 2024.09 | 4 |
| 2024 | Panel-cover machining | KHNP | 2024.11 | 4 |
| 2024 | Water-meter and piping installation · phase 1 | Firstkeepers | 2024.02 – 2024.03 | 8 |
| 2024 | Water-meter and piping installation · phase 2 | Firstkeepers | 2024.03 – 2024.04 | 8 |
| 2024 | Water-meter and piping installation · phase 3 | Firstkeepers | 2024.04 – 2024.05 | 7 |
| 2024 | Water-meter and piping installation · phase 4 | Firstkeepers | 2024.07 | 11 |
| 2024 | Water-meter and piping installation for ancillary facilities | Firstkeepers | 2024.09 | 3 |
| 2024 | Discharge facility improvements | Korea Southern Power | 2024.02 | 22 |
| 2023 | Outdoor tank drain-piping installation | KHNP | 2023.04 – 2023.05 | 21 |
| 2023 | Exhibition facility flood-protection improvements | KHNP | 2023.05 – 2023.06 | 21 |
| 2023 | Hot-water piping replacement for ancillary facilities | Firstkeepers | 2023.09 | 4 |
| 2023 | Welfare facility plant-room hot-water piping replacement | Firstkeepers | 2023.09 | 8 |
| 2023 | Storage facility spillage-prevention maintenance | Korea Southern Power | 2023.10 – 2023.12 | 19 |
SCAFFOLDING
Scaffolding
23entries
Preventive-Maintenance Scaffolding Support · Scaffold erection and dismantling to secure safe access and working space for maintenance tasks.
2026 entries use completion values; earlier entries use annual reported values.
Amounts: KRW million
Scroll the table horizontally to see periods and amounts. →
| Year | Scope of work | Client / counterparty | Reported work period | Value |
|---|---|---|---|---|
| 2026 | Scaffolding for detector replacement | Prime E&C | 2026.07 | 5 |
| 2026 | Swimming-pool ceiling steelwork removal | First Keepers | 2026.06 – 2026.07 | 7 |
| 2026 | Scaffolding installation and removal for plant maintenance | KEPCO KPS | 2026.03 – 2026.05 | 455 |
| 2026 | Tubular scaffolding for rebar inspection | KHNP | 2026.01 – 2026.02 | 12 |
| 2025 | Scaffolding support for fire-alarm upgrades | Daewon General ENG | 2025Reporting year only; dates require verification | 214 |
| 2025 | Scaffolding and insulation for planned maintenance | KEPCO KPS | 2025.03 – 2025.06 | 948 |
| 2025 | Scaffolding and insulation maintenance support | KEPCO KPS | 2025.09 – 2025.11 | 183 |
| 2025 | Scaffolding for electrical installation | KHNP | 2025.11 – 2025.12 | 14 |
| 2024 | Scaffolding for lighting upgrades | Firstkeepers | 2024.02 – 2024.03 | 3 |
| 2024 | Tubular scaffolding for residential facilities | Firstkeepers | 2024.07 | 2 |
| 2024 | Lightweight scaffolding for pool equipment removal | Firstkeepers | 2024.10 | 8 |
| 2024 | Scaffolding for fire-detector maintenance | KHNP | 2024.01 | 3 |
| 2024 | Scaffolding for plant maintenance | KHNP | 2024.06 – 2024.07 | 11 |
| 2024 | Tubular scaffolding for lighting repairs | Reel Tech | 2024.09 | 4 |
| 2023 | Scaffolding installation and removal for fire-protection upgrades | Yoonyoung Fire Protection Engineering | 2023.03 – 2023.07 | 660 |
| 2023 | Scaffolding for detector replacement | KHNP | 2023.03 | 3 |
| 2023 | Scaffolding for piping and valve installation | Jeongin Construction | 2023.03 – 2023.04 | 13 |
| 2023 | Scaffolding for cathodic-protection maintenance | Samgong | 2023.03 – 2023.04 | 5 |
| 2023 | Scaffolding for cathodic-protection maintenance | Samgong | 2023.04 – 2023.05 | 9 |
| 2023 | Scaffolding for cathodic-protection maintenance | Samgong | 2023.11 | 2 |
| 2023 | Scaffolding for warehouse detector replacement | KHNP | 2023.04 | 3 |
| 2023 | Scaffolding for detector replacement | KHNP | 2023.06 | 2 |
| 2023 | Scaffolding for fire-detector inspection | KHNP | 2023.09 | 5 |
FIRE PROTECTION
Fire-related work
0entries
No project records are currently published in this category.
MANUFACTURING
Manufacturing & Supply
15entries
Factory-Based Manufacturing and Supply · From its registered factory, DAEWON TECHNOLOGY coordinates drawing and specification review, made-to-order, equivalent and off-the-shelf procurement, quality inspection, and site delivery as one workflow.
Completed deliveries are listed separately from contracts. Contract periods run from contract date to delivery deadline.
Amounts: KRW million
Scroll the table horizontally to see periods and amounts. →
Completed deliveries
| Scope of work | Client / counterparty | Delivery date | Delivery value |
|---|---|---|---|
| Conduit and support-material supply for detection equipment | KEPCO KPS | 2026.01.23 | 3 |
| Conduit connector and electrical material supply | KEPCO KPS | 2026.01.23 | 5 |
| Conduit and electrical accessory supply | Soosan Industries | 2026.01.23 | 3 |
Manufacturing and supply contracts
| Scope of work | Client / counterparty | Contract–delivery deadline | Contract value |
|---|---|---|---|
| Pipe spool manufacturing and supply | KHNP | 2026.09.01 – 2026.10.16 | 32 |
| Conduit and equipment maintenance material supply | KEPCO KPS | 2025.12.30 – 2026.01.22 | 15 |
| Conduit connector and electrical material supply | KEPCO KPS | 2025.08.13 – 2025.08.30 | 7 |
| Electrical load test equipment manufacturing and supply | KHNP | 2025.08.07 – 2025.10.13 | 84 |
| Power-transmission chains and related supply | KHNP | 2025.05.14 – 2025.08.13 | 464 |
| Bearing-related reference specimen manufacturing and supply | KHNP | 2025.02.28 – 2025.05.30 | 74 |
| Equipment protective-cover manufacturing | KHNP | 2023.12.21 – 2024.02.19 | 136 |
| Lowering-type outdoor lighting pole supply | KHNP | 2023.12.15 – 2024.01.16 | 41 |
| Expansion-joint manufacturing and supply | KHNP | 2023.12.04 – 2024.04.05 | 10 |
| Maintenance-support memory supply | KHNP | 2023.11.13 – 2023.12.15 | 2 |
| Lubrication and maintenance material supply | KHNP | 2023.09.15 – 2023.10.16 | 13 |
| Relay test equipment supply | KHNP | 2023.06.29 – 2023.09.04 | 49 |